Your English writing platform
Free sign upSuggestions(5)
Exact(7)
Spectrum scheduling: which SU should be scheduled in each band?
Two main questions arise: Spectrum scheduling: which SU should be scheduled in each band?
Because there are m machines, m tasks can be scheduled in each slot.
Therefore, the maximum number of orthogonal beams is equal to Mt = 4, i.e., Mt = 4 users can simultaneously be scheduled in each PRB.
Since we assume that l k =N T, the maximum number of users that can be scheduled in each cluster during each TTI is, K_{max} le leftlfloor frac{B N_{mathrm{R}}}{N_{mathrm{T}}} rightrfloor (3).
Furthermore, the maximum number of the UEs that can be scheduled in each TTI is limited by the possible number of scheduling grants which can be carried by the physical downlink control channel (PDCCH).
Similar(52)
His wife, Daisy Khan, who is in New York, said she believed that at least one public event was scheduled in each country and that she had no objection to a reporter sitting in quietly on a public event.
Scheduling: In time domain, all the active UEs are scheduled in each TTI.
Note that May was the dominant test month in 2001, and according to Martin et al. (Mullis et al. 2003, p. 10), "the 2001 data collection was scheduled in each country for the same time of year, as in 1991".
All the users in our system model have the same distribution for their relative CNRs [19] and the relatively best user (i.e., the user with the highest r i (t k )=α i ) is scheduled in each time-slot.
These sessions are designed to be delivered in Facebook events and events are scheduled in each group separately.
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.
Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com