Suggestions(2)
Exact(5)
Constraints: i) Constraints associated with the nature of the programme -- the innovative character of the programme as a community development approach based on planning and as a community-based social mobilization, makes it inevitable for the process to demand, not only constant negotiation with the communities, but also a validation with the technical and political partners.
The approach is based on planning and operations scheduling models, and is designed to minimize travel and production costs within a flexible organizational network.
Simulation tool provides a comprehensive development environment for the specification modelling, system simulation and also facilitate performance evaluation of the system under study with different topologies that guide the SAS network engineers based on planning and design.
Given the frequently-changing situations IDUs find themselves in, particularly in those periods of their lives when they are street users, they sometimes have trouble recognizing the extent to which their actions indeed are based on planning and intentionality rather than being overwhelmingly circumstantial and reactive.
(Delta trust3, finance director) The final days of the internal market in Wales saw an acknowledgement that contracts would now only have a brief life in the transition to a system based on planning, and the running down of the negotiating and monitoring arrangements built up in previous years.
Similar(55)
For a certain hazard, situational awareness is one of the most important factors in decision making (Zlatanova 2008), either before an event, based on planning simulations and preventive measures, or immediately after a disaster event through effective emergency management.
Two different contracts have been drawn up - one based on planning permission at Nevil Road being received and the other on it being denied.
The economy will continue to be based on planning, not the market, and "the concentration of property" will be prohibited, Raúl Castro insisted in a speech to the National Assembly in December 2010.
The amount of corrosion allowance is determined by assessing in some manner how the fluid reacts with the material, and adding an allowance of material based on planned life and severity of attack.
The pattern must be based on planned glycemic and HbA1c goals, on the real feasibility of changing treatment and on the risk of hypoglycemia.
The performance based contracting is based on planned outputs and staff performance indicators.
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com