Sentence examples for available buildings from inspiring English sources

Suggestions(1)

The phrase "available buildings" is correct and usable in written English.
It can be used when referring to buildings that are currently open for use, sale, or lease.
Example: "The real estate agent provided a list of available buildings for potential buyers."
Alternatives: "accessible properties" or "open buildings".

Exact(7)

There is no sanctum, either: the designers looked at the nearest available buildings, which were mosques.

But as prices for New York real estate continue to soar, some developers have managed to find available buildings suitable for conversion and the financing necessary to buy them.

Still, the project is rising in the easternmost stretch of TriBeCa, hard against an area of municipal and court buildings, reflecting how development is moving farther out from the heart of the neighborhood as developers look for available buildings to convert or sites to redevelop, residential brokers said.

Reinforced concrete projects are re-calculated by protecting structural systems' properties of available buildings in two ways: firstly by calculating in terms of only buildings' vertical load effects not considering the seismic loads; secondly by calculating the under seismic loads according to 1975 Turkish Earthquake Code which was built on the date of these buildings' designed.

"We have 15 football fields of available buildings.

Although some have argued that barriers on bridges are effective at preventing suicide, 24 the evidence in the literature in favour of such barriers when there are other available buildings or bridges is weak, in part due to the scarcity of bridges with pre-barrier suicide rates of sufficient magnitude to make statistical calculations plausible.

Show more...

Similar(53)

Many of the available building lots slope steeply or are next to highways and major thoroughfares.

Furthermore, NMP6 was easily obtained in two chemical steps from commercially available building blocks.

The true development professional is awaiting the absorption of available building inventory before constructing new speculative buildings.

The integrated design procedure focuses on the problem of a large number of available building variants concerning the building envelope.

Among the several available building systems, constructions involving cold-formed steel (CFS) profiles represent an efficient and reliable solution.

Show more...

Ludwig, your English writing platform

Write better and faster with AI suggestions while staying true to your unique style.

Student

Used by millions of students, scientific researchers, professional translators and editors from all over the world!

MitStanfordHarvardAustralian Nationa UniversityNanyangOxford

Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak quote

Justyna Jupowicz-Kozak

CEO of Professional Science Editing for Scientists @ prosciediting.com

Get started for free

Unlock your writing potential with Ludwig

Letters

Most frequent sentences: