Suggestions(1)
Exact(7)
Attainable rates of growth of per capita income appear to be far above what formerly was thought feasible.
The use of this metric to compare attainable rates presupposes that a well-functioning CoMP scheme will suppress intracluster interference.
Obviously, since the simple schemes can be understood as adding constraints to the most general case, they are less efficient in terms of attainable rates.
Based on these results, we observe that the different implementations of the RP algorithm considerably improve the attainable rates and energy efficiency, achieving approximately up to 292% increase of data rate and 203% increase of energy efficiency when compared to [15].
Three users with dB, respectively... Similarly as done in RR, the calculation of the maximum attainable rates in the case of Best Channel strategy leads to the computation of the variance of the blocks (the evaluation of the mean of the blocks is straightforward), which comes down to the computation of the expectation.
The long life spans of most threatened marine vertebrates are combined with delayed reproductive maturity and/or low reproductive rates; these life history traits create the prima facie conditions that make these species at-risk because they sharply limit their maximum attainable rates of population growth.
Similar(52)
As presumed, the curve increases with (the more relaxed the QoS requirements, the higher the maximum attainable rate).
Studying this lower dimensional CM-DM joint processing in the vectoring context is important since the CM-DM combining at the TP influences the channel matrix (the CWDD parameter and the SNR), and hence the attainable rate with vectoring.
First, although the link attainable rate is typically a non-convex and non-separable function of persistent probabilities, we prove the convergence of this cross-layer algorithm to the global optimum of joint congestion control and random access algorithm under the framework of nonlinear programming.
Maintaining growth at the maximum specific growth rate (μ, in h−1) does not often correlate with the highest attainable rate of specific product formation (qp, in g g−1 h−1).
We obtain a closed-form expression of the vector of attainable users' rates for several scheduling algorithms, representing the maximum constant rate that the uth user can transmit under the selected discipline and fulfilling a target Bit Error Rate (BER) and the delay constraint given by the pair, where is the target delay and is the probability of exceeding.
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com