Your English writing platform
Discover LudwigSuggestions(1)
The phrase "at catchment outlet" is correct and usable in written English.
It can be used in contexts related to hydrology, environmental science, or water management, referring to the point where water exits a catchment area.
Example: "The water quality was measured at catchment outlet to assess the impact of upstream activities."
Alternatives: "at drainage point" or "at watershed exit".
Exact(2)
The pesticide application date was changed within a one-month interval and the pesticide concentration at catchment outlet was simulated from March to June 2010.
We compared the parameters' posterior distributions, modelling performance using the best estimated parameter set and 95% prediction confidence intervals at catchment outlet for the calibration period that were derived from single-site calibration (SSC) and multi-site calibration (MSC) modes.
Similar(58)
No consensus has yet been reached regarding the influence of rainfall spatial variability on runoff modelling at catchment outlets.
In the Southern Prealps in France, to avoid sediment transport at catchment outlets, low-cost rehabilitation actions can be employed such as using bioengineering techniques within small gullies to trap and retain eroded materials before they reach the catchment outlet.
Next, the runoff generation characteristics of a small granitic catchment (0.99 km2) in southern China were analyzed, based on long-term monitoring of rainfall, runoff at the catchment outlet and at different depths in two plots, along with monitoring of soil suction and soil water content at different depths in these two plots (5 m × 10 m).
Landslide volumes were an order of magnitude smaller than the debris flows at the catchment outlet.
The value of each SAR is evaluated solely in terms of flow simulation quality at the catchment outlet.
The impact of the Swindon sewage treatment works (SSTW) on water chemistry at the catchment outlet is considerable.
This contribution was systematically null at the catchment outlet because of the rapid dissolution of gypsum in the river.
To perform an IHS, samples of baseflow (pre-event water) and streamflow are taken at the catchment outlet.
Sediments deposited along the shelterbelts at a rate of ca. 78 t yr− 1 and ca. 33 t yr− 1 at the catchment outlet.
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com