Your English writing platform
Discover LudwigSuggestions(1)
Exact(18)
Each assembly agent can assemble a limited number of different products.
After that, the facilitator agent chooses some suitable resource agents for producing the decomposed components of the requested product and also chooses an assembly agent for assembling the product.
Table 19 Transportation cost between assembly agent and the customer Assembly agent 1 2 3 4 5 6 7 Customer 40 70 100 150 250 180 200 Table 20 Transportation time between assembly agent and the customer (hour) Assembly agent 1 2 3 4 5 6 7 Customer 0.5 1.0 2.0 1.5 3.0 0.5 5.0 Precedence condition of product 3 for its assembly implementation is given in Table 5.
The second part represents the assemble sequence in the selected assembly agent as shown in Table 2.
When a product is assembled, every component has to be handled by an assembly agent from the feeding position to the composing position.
The first part encodes the assembly agent selection.
Similar(42)
The product information such as the number of Parts to be decomposed, which manufacturing agents are capable of producing the decomposed Parts, which assembly agents are capable of assembling the product and precedence conditions for assembly operation is given in advance.
Assembly cost and assembly time in different assembly agents are not the same but given in advance.
Capabilities of assembly agents are shown in Table 16.
There are seven assembly agents and 13 manufacturing agents in the VCIM system.
The changeover takes a certain amount of time and it is different in different assembly agents.
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com