Sentence examples for airport phase from inspiring English sources

Exact(1)

The proposed design procedure has been used for the Auckland International Airport Phase 4 Pier B Extension Project's structural fire design, brief details of which are presented.

Similar(59)

Originally known as the Airport Railway Phase 2, the contracts of the West Rail Line Interface Works were awarded shortly after construction works of the West Rail commenced.

In the last few minutes it said: LAX Airport (@LAX_Official) Phasing of re-openings of T1 & 2 & parking structures begins shortly.

Many outsiders, not all of them Turks, doubt whether Iranian companies have the wherewithal to build the airport's second phase.

Ahmad Khorram, the then transport minister, irked Iranian nationalists when he invited Tepe-Akfen-Vie, a Turkish-dominated consortium, to build and run the airport's first phase; the guardsmen are said to have been piqued that conservative Iranian companies were denied the contract.

These developments are unfolding within the context of two large infrastructure projects: a 250 million ringgit (about $59 million) upgrade of Penang's international airport — the first phase of which will be finished by early 2012 — and the construction of a second bridge to the Malaysian mainland, scheduled for completion by the end of 2013.

During the containment phase, airport thermal scanners were used to detect fevers in arriving passengers at Singapore's Changi International Airport, and health advisories were used to encourage travelers in whom influenza-like symptoms developed after disembarkation to seek medical care.

If the airport went ahead with phase two and built a second runway, it soon became clear, its finances would collapse.

"It has no tools to impose its authority… This conflict over the airport is a dangerous phase".

In the above discussions, the flight phases P3 (takeoff) and P12 (landing) are assumed to occur in the vicinity of the airport since the flight phases occur at a low height over the runway.

For instance, the highest levels of HC emissions are observed for the phases of descent, taxi out, and taxi in, for which the corresponding durations are 18, 12, and 4 min. Considering the air quality in the vicinity of the airport (related to flight phases P1 to P3 and P12 to P14), it is found that 2.9 kg of HC is produced in AYT and 0.8 kg in SAW.

Show more...

Ludwig, your English writing platform

Write better and faster with AI suggestions while staying true to your unique style.

Student

Used by millions of students, scientific researchers, professional translators and editors from all over the world!

MitStanfordHarvardAustralian Nationa UniversityNanyangOxford

Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak quote

Justyna Jupowicz-Kozak

CEO of Professional Science Editing for Scientists @ prosciediting.com

Get started for free

Unlock your writing potential with Ludwig

Letters

Most frequent sentences: