Sentence examples for a work breakdown structure from inspiring English sources

The phrase "a work breakdown structure" is correct and usable in written English.
It is typically used in project management to describe a hierarchical decomposition of a project into smaller, more manageable components.
Example: "To effectively manage the project, we need to create a work breakdown structure that outlines all the tasks involved."
Alternatives: "project breakdown structure" or "task breakdown structure".

Exact(7)

First, the product development process is decomposed by using a work breakdown structure (WBS) to obtain design activities.

This paper presents a work breakdown structure (WBS -based database design to enable the creation of a dynamic multi-dimensional BIM database to incorporate construction records in a timely manner.

Our case study simulated the planning process for a product development project, including a work breakdown structure, milestone schedule, quantitative risk analysis, and assessment of anticipated project success.

The project managers dragged and dropped six predefined work packages (Appendix Fig. 3) into a work breakdown structure, divided into four sections.

A case study simulated the planning process of a product development project, including a work breakdown structure, a milestone schedule, a quantitative risk analysis, and an assessment of anticipated project success in terms of time, costs, and quality.

Write a project plan that includes action steps and a work breakdown structure.

Show more...

Similar(53)

As an example, all four regions adopted an identical work breakdown structure (i.e., the same manner of defining the structure of the product and the manufacturing processes).

A resources matrix is a table estimating how much of a particular resource each item in the work breakdown structure will require.

3- Object selection: Choose an object according to the approved work breakdown structure in construction projects because the image-based 3D reconstruction model in this study is used for the visualization of as-built data for construction progress monitoring.

The work breakdown structure was not a measurement instrument, but was rather intended to help participants become familiar with the project and associated tasks.

In this paper, a framework which employs neural networks to plan the work breakdown structure of projects has been introduced.

Show more...

Ludwig, your English writing platform

Write better and faster with AI suggestions while staying true to your unique style.

Student

Used by millions of students, scientific researchers, professional translators and editors from all over the world!

MitStanfordHarvardAustralian Nationa UniversityNanyangOxford

Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak quote

Justyna Jupowicz-Kozak

CEO of Professional Science Editing for Scientists @ prosciediting.com

Get started for free

Unlock your writing potential with Ludwig

Letters

Most frequent sentences: