Your English writing platform
Discover LudwigSimilar(60)
A validating system as a prototype was established on the basis of the design method and the scheduled objective of the controlled temperature (43 °C).
But B612 has struggled to meet its fundraising goals and scheduled objectives, and, earlier this week, it was reported that NASA had ended a cooperative agreement with B612.
So in addition to project time, resource leveling index is considered as a part of scheduling objectives.
This study constructs a non-linear timeliness evaluation function for emergency resource scheduling that incorporates a single affected point, multiple supply centers and one type of resource, which combines two scheduling objectives, i.e., time and resource satisfaction, into a timeliness function.
However, few studies examine process planning issues in a network of AM systems that account for part-to-printer assignment involving multiple parts and printers with scheduling objectives.
Nephrologists evaluated 18 adverse effects for each renal transplant patient during a scheduled clinic visit using objective clinical documentation including physical exam, review of systems and recent laboratory results.
The plan sought to increase the number of countries and projects for which the bank helped to address related issues systematically, although it did not set targets or a schedule for objectives to be achieved.
Limited numerical results show that, as expected, buffer size has a great impact on the scheduling objective especially for larger-scale instances, and there are also significant differences with or without buffers for all instances.
These fell into a mainstream range of qualitative techniques that are commonly used to evaluate humans at work, and included cab walkthroughs on stationary trams, on-road observations on scheduled services, objective force assessments, interviews, and focus groups.
(1), substituted "by at least 25percentt, or the program manager determines that the period of time required for the delivery of an initial operational capability is likely to exceed the schedule objective established pursuant to section 181(b)(5) of this title by more than 25percentt," for "by at least 25percentt,", and added par.
The scheduling objective is to minimize the terminal estimation error covariance.
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com