Your English writing platform
Discover LudwigThe phrase "a schedule that indicates" is correct and usable in written English.
You can use it when referring to a timetable or plan that shows specific information or details about events or tasks.
Example: "The project manager provided a schedule that indicates the deadlines for each phase of the project."
Alternatives: "a timetable that shows" or "a plan that outlines".
Exact(1)
Republican suits against the plan are now on a schedule that indicates the Supreme Court will rule on it, at the earliest, by spring of 2017.
Similar(59)
The laptop contained a randomization schedule that indicated whether the hypoglycemia prediction algorithm would be in operation that night (intervention night) or would not be activated (control night), to which the participant was blinded, with half of the nights being intervention nights and half control nights.
These factors often indicate a schedule that can be altered.
In 2011, the United States Drug Enforcement Agency DEAA) temporarily classified mephedrone, 3,4-methylenedioxypyrovalerone (MDPV), and methylone as Schedule 1 drugs, a designation that indicates drugs with no accepted medical use and very high abuse liability [13].
In providing a rationale for front-loaded salary schedules, the authors cite research that indicates teachers are the most important school factor in predicting student performance, and that school district success thus depends on a district's ability to maintain a high-quality teacher workforce.
Ultimately, Black — without having reached any concrete arrangement with Cerberus — caused Inc. to file a Schedule 13D indicating that he had had discussions with a firm about a proposal that might result in an offer to International's public stockholders.
Kong says that she paid $50, and Den was returned to her, wearing a yellow paper bracelet that indicated she was scheduled to be moved from the clinic the next day.
A positive Schedule Variance indicates that the project is ahead of schedule.
Workers in Germany, India, and the U.S. were the most likely to work on a flexible schedule, possibly indicating that these countries are trending toward a new normal by offering more flexibility.
ORTO-11-Hu scores were significantly associated with the consumption of healthy food and eating according to a fixed schedule, indicating that respondents consuming mainly healthy food and following a strict eating schedule scored lower on ORTO-11-Hu (meaning a higher tendency for ON).
Daina showed Spike a slave schedule indicating that a Samuel Griswold was a large slave owner in the area.
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com