Your English writing platform
Discover LudwigExact(11)
The second schedule assumes that Job B is run first.
The second schedule was conducted in Dubai.
The second schedule started on 12 April in Mumbai.
The second schedule was shot in Ramoji Film City in Hyderabad.
The second schedule of the film was held in Prasad Studios.
The second schedule began at Mumbai from 20 September 2011 and Mahesh confirmed in an interview that it would last until 5 December 2011.
Similar(49)
The second scheduling model comprises a rolling intraday unit commitment and a real-time dispatch with look-ahead capability (two-level model).
The World outdoor meet was first held in Helsinki in 1983, with the second scheduled for this summer in Rome.
The third schedule involved rejuvenation of the specimen above Tg between each measurement.
Power efficiency is used as the third schedule performance indicator and is related to the mean transmit power per packet.
The first schedule, that lasted for 35 days, was completed by January 2012.
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com