Your English writing platform
Discover LudwigExact(25)
In this schedule, all considered constraints are met.
In this schedule, there must be at least two adjacent jobs, say job j followed by job k, such that (frac{{pr_{j} - c_{j} }}{{p_{j} }} < frac{{pr_{k} - c_{k} }}{{p_{k} }}).
In this schedule, 300 mg b.i.d.
In this schedule, reinforcement is provided intermittently for responding on two operanda, A and B, responding on A being reinforced in the first half, and responding on B in the second half of each trial.
In this schedule, consider the call shift that starts at 4 p.m. on Saturday with MDs D and F. Note that MD F is scheduled to work service every day during the week whereas MD D is scheduled to work the Wednesday call shift, which is 2 to less than 3 days before the start of the Saturday call shift.
In this schedule, set-aside 30-minute blocks for relaxing activities.
Similar(34)
In constructing this schedule, the scheduler reduces its search space using the MILP solution.
In this scheduling, the effects of reliability and costs are adjusted at 0.7 and 0.3, respectively.
In this scheduling we should consider to have no overlap in using this unique equipment for different surgeries.
If the UE does not find the channel idle for all the K CCA opportunities, it cannot transmit data in this scheduling cycle.
In this scheduling problem on parallel machines, any job j can only be assigned to one of the machines in its given subset Mj of machines.
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com