Open image in new window Fig. 4 Number of conflicts on each siding in actual schedule.
Similar(59)
The analysis results in an actual schedule.
For each node on the ordered list, we define two parameters that are node possible start time (NPST) and node end time (NET), which describe the freedom or possible slots in the actual schedule; they are defined according to (5).
In the actual scheduling, schemes like exponential scheduler have been implemented with improved delay, fairness, and throughput characteristics as compared to Proportional Fair and M-LWDF algorithm.
The project is statistically in control when its actual schedule performance indicator at the review period (j), say ({text{EDI}}^{j}), falls between the control limits.
Using this framework, we conduct detailed computational experiments based on actual schedule data at three of the busiest airports in the United States.
A target-actual construction schedule comparison uses this actual schedule.
The result of this analysis is the actual schedule.
As a result, an actual schedule is generated, such that a target-actual schedule comparison can be performed.
Furthermore, a target-actual comparison is utilized to identify deviations between the planned target schedule and the actual schedule.
This actual schedule should be compared to the target schedule to detect significant deviations.
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com